Commercial

Harbor Point Office Campus

A six-storey office building with a glazed curtain wall and a two-storey podium, delivered in 22 months next to a fully operational neighbouring building.

  • Waterfront District, Lakemont City
  • Completed January 2025
  • 22-month programme
Elevation drawing of the Harbor Point glass office tower rising above its two-storey podium

Project overview

Harbor Point Holdings needed modern, flexible office space for 600 employees on a tight waterfront plot, without disrupting the company's existing headquarters next door.

Aldervane was appointed as design-and-build contractor after the concept stage. Our scope covered detailed design coordination, piled foundations, the concrete frame, the unitised curtain wall, building services, interior fit-out and external works.

The challenge

The site shared a boundary with an occupied office building and a busy public promenade. Deliveries had to be scheduled outside working hours, noise and vibration were strictly limited, and the high water table complicated the foundation design.

  • No disruption to 400 staff working next door
  • Restricted delivery windows and no on-street storage
  • Ground conditions affected by the nearby harbour

Our solution

We replaced driven piles with low-vibration bored piles and installed continuous monitoring on the neighbouring building. A just-in-time logistics plan brought façade units to site in the early morning, lifting them straight from the truck into position.

Prefabricated bathroom pods and riser modules cut the number of trades on site, while weekly coordination meetings with the client's facilities team kept both buildings running smoothly.

Results

The building was handed over on the agreed date and within the approved budget. The neighbouring headquarters recorded no lost working days during construction.

  • 22

    Months from start on site to handover

  • 0

    Working days lost next door

  • 31%

    Lower energy use than the previous offices

Project gallery

Project facts

Client
Harbor Point Holdings
Category
Commercial
Scope
Design and build
Floor area
86,000 sq ft
Timeline
Mar 2023 – Jan 2025
Location
Lakemont City

Our staff next door barely noticed a construction site was there. That says everything about how this project was run.

Daniel Osei Operations Director, Harbor Point Holdings

Planning a similar project?

We will share lessons from Harbor Point and prepare a budget range for your site.

Talk to our team

Let’s deliver your next building on time

Share your brief and we will outline the approach, the programme and the budget range within a week.